Sort:
Version 1
16. November 2016.
1 vote, average: 1.00 out of 51 vote, average: 1.00 out of 51 vote, average: 1.00 out of 51 vote, average: 1.00 out of 51 vote, average: 1.00 out of 5
0 comments
by Luca Lucentini et al., 15. November, 2016

Checklist for auditing a drinking water treatment plant

by Luca Lucentini et al., 15. November, 2016

This checklist is conceived as an on-site, concise tool to support the Egyptian Water Regulatory Agency (EWRA) inspectors in performing a comprehensive audit of drinking water treatment plants. It covers both management and technical aspects of service provision in assuring adequate level of performance for health and environmental protection. The list is co...

Version 1
18. October 2017.
0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5
0 comments
by Mahmoud Abd Al Rahman Saad Mehany et al., 01. May, 2017

Water Safety Plan for Edfina Drinking Water Supply System, Behira Governorate – Egypt

by Mahmoud Abd Al Rahman Saad Mehany et al., 01. May, 2017

Edfina Drinking Water Treatment Plant was installed at Behira governorate, Egypt in 1998 and, due to increasing of water demand, the water authority intends to increase its capacity by installing a new conventional water treatment plant. However, water resources are suffering from many illegal activities in the catchment which deteriorate the raw water quali...

Version 1
29. May 2017.
1 vote, average: 1.00 out of 51 vote, average: 1.00 out of 51 vote, average: 1.00 out of 51 vote, average: 1.00 out of 51 vote, average: 1.00 out of 5
0 comments
by Mahmoud Abd Al Rahman Saad Mehany et al., 2016

WSP Status in Egypt

by Mahmoud Abd Al Rahman Saad Mehany et al., 2016

Egypt has accomplished the first draft of WSP at 2013, via cooperation between the Holding Company for Water and Wastewater and the VNG – International, this abstract represent the current situation of WSP in Egypt....